Private preview. We are building worklist with a small group of operations teams.Request early access

A4239: CGM supply allowance. What Medicare needs on the order

A4239 is the monthly supply allowance for a non-adjunctive continuous glucose monitor (CGM): sensors, transmitters and any backup meter supplies, one unit per month. Medicare covers it for patients with diabetes who use insulin or have documented problematic low blood sugar, after a practitioner visit within 6 months before the order.

HCPCS A4239

Official description
Supply allowance for non-adjunctive, non-implanted continuous glucose monitor (cgm), includes all supplies and accessories, 1 month supply = 1 unit of service
Short descriptor
Non-adju cgm supply allow
Medicare policy
LCD L33822, article A52464
Payment
Supplies: a monthly allowance, up to 3 units per 90 days
Prior authorization
Not required by Medicare
Face-to-face and order before delivery
Not on the CMS list. The LCD requires a practitioner visit within 6 months before the order, then every 6 months.
Last checked
November 11, 2026

What the code covers

A4239 is one month of supplies for a non-adjunctive CGM, which is a CGM the patient can use to make treatment decisions without checking with a fingerstick meter. It includes sensors and transmitters, and also a home blood glucose meter and its supplies (strips, lancets, lancing device, control solution and batteries) if the patient needs them. The CGM receiver itself is E2103. The supply allowance for an adjunctive CGM is A4238.

When Medicare covers it

A CGM and its supply allowance are covered when all five initial criteria are met:

  1. The patient has diabetes mellitus, with a diagnosis listed in the Policy Article.
  2. The treating practitioner has concluded the patient or caregiver is trained to use the CGM, shown by the prescription.
  3. The CGM is prescribed in line with its FDA indications for use.
  4. The patient is insulin-treated, or has a history of problematic hypoglycemia: more than one level 2 event (glucose below 54 mg/dL) that persists despite more than one change to medication or the treatment plan, or at least one level 3 event (glucose below 54 mg/dL with an altered mental or physical state that needed someone else’s help).
  5. Within the 6 months before the order, the treating practitioner had an in-person or Medicare-approved telehealth visit to evaluate diabetes control and confirm criteria 1 to 4.

Continued coverage. Every 6 months after the first prescription, the treating practitioner must have an in-person or telehealth visit that documents the patient is following the CGM regimen and treatment plan.

The CGM billed as E2103 must be listed for that code on the PDAC Product Classification List. Blood glucose meters and their supplies billed alongside a non-adjunctive CGM and A4239 are denied, because the allowance already includes them.

What the order and records need

  • A standard written order with the patient’s name or MBI, the order date, the item, the quantity, and the treating practitioner’s name or NPI and signature.
  • The visit note from within 6 months before the order, covering criteria 1 to 4.
  • For problematic hypoglycemia, the classification of the events as level 2 or level 3, or a copy of the meter log showing the qualifying readings.
  • Visit notes every 6 months after that.
  • Proof of delivery.

Medicare does not require prior authorization or a certificate of medical necessity for A4239.

Modifiers

  • KX if the patient is insulin-treated, or KS if not. One of them goes on every claim. KX must not be used for a patient treated only with oral medication.
  • CG only when all the initial CGM criteria, or later the continued coverage criterion, are met.
  • KF if the CGM is an FDA Class III device, and never if it is not. Check with the FDA or the manufacturer when unsure.

Rental or purchase

A4239 is a supply allowance, not equipment. One unit covers one month. Up to 3 units can be billed for 90 days at a time, and no more than a 90-day supply can be dispensed at once. A supplier does not have to ship every month to bill every month, but it must already have delivered enough supplies to last the full month after the date of service. The usual supply refill-contact rules do not apply to A4239.

Why claims get denied

  • The patient is not insulin-treated and the record does not document qualifying low blood sugar events, or the visit within 6 months before the order is missing. These are medical necessity denials like CO-50.
  • The 6-month follow-up visit is missing.
  • More than 3 units billed for 90 days. See CO-151 for frequency denials.
  • Test strips or lancets billed separately on top of A4239.
  • A missing or wrong KX, KS, CG or KF modifier. See CO-4, and MA130 for claims returned as unprocessable.

Sources

Last checked November 11, 2026 against the documents below. These are the Medicare fee-for-service rules that the DME MACs (Noridian and CGS) apply. Medicare Advantage plans, Medicaid and commercial payers set their own rules, so requirements can differ by payer. Policies change, so check the current version before you rely on a detail.

Early access

Run your revenue cycle as workflows.

We are working with a small group of billing and operations teams to shape worklist. Tell us where your work gets stuck, and we'll show you how it would run.

One platform, every role

Operators

A worklist of exceptions, each ready to answer, fast and in bulk.

Team managers

Who works what, what is overdue, what nobody owns, and how good the work is.

Automation builders

Build, test, version and monitor workflows, rules and connections.

Owners and CFOs

The money and work that is stuck, why, what automation recovered and what it costs.

Practices and patients

Answer the one thing only you can answer, from an email link, without an account.

Billing companies

The same screens across every organization you serve.

We'll call you back

Step 1 of 5

Request early access

We're opening worklist to a small group of billing and operations teams first. Start with your work email, then four quick questions about your team.

  • A place in the private preview
  • A say in what we build first
  • No payment details, no commitment